Mobile Work Over Rig
Job can be done: - Setting of packer, Releasing of packer, Testing of casing, Besetting of R3 packer, Testing of Tubing, Abandon of well by putting Cementing plug, Testing of plug, Installation of SRP, Testing of SRP, Clearing of well bore with 5 ½” casing, Transfer of Zone by setting bridge plug.
Specification :
Capacity | 30 Tonne (150 Hp) / 40Tonne (250 Hp) / 50 Tonne (350 Hp). |