Mobile Work Over Rig

Mobile Work Over Rig

Job can be done: - Setting of packer, Releasing of packer, Testing of casing, Besetting of R3 packer, Testing of Tubing, Abandon of well by putting Cementing plug, Testing of plug, Installation of SRP, Testing of SRP, Clearing of well bore with 5 ½” casing, Transfer of Zone by setting bridge plug.

Specification :

Capacity 30 Tonne (150 Hp) / 40Tonne (250 Hp) / 50 Tonne (350 Hp).